MRC | Criteria | Characteristic |
---|
AAQL | BODY STYLE | W/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE" |
AARG | RELIABILITY INDICATOR | ESTABLISHED" |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010" |
ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM" |
ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL" |
ADAT | BODY WIDTH | 0.290 INCHES NOMINAL" |
ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL" |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL" |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL" |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S)" |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS" |
CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION" |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25.0/+15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION" |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM" |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION" |
CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION" |
CWJK | CASE MATERIAL | PLASTIC" |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS" |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000" |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER" |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED" |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS, BROCHURES,ETC., THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS, INDUSTRY DIRECTORIES, AND SIMILAR TRADE PUBLICATIONS, REFLECTI" |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD" |
ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION" |
AAQL | BODY STYLE | W/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE" |
AARG | RELIABILITY INDICATOR | ESTABLISHED" |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010" |
ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM" |
ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL" |
ADAT | BODY WIDTH | 0.290 INCHES NOMINAL" |
ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL" |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL" |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL" |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S)" |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS" |
CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION" |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25.0/+15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION" |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM" |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION" |
CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION" |
CWJK | CASE MATERIAL | PLASTIC" |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS" |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000" |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER" |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED" |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS, BROCHURES,ETC., THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS, INDUSTRY DIRECTORIES, AND SIMILAR TRADE PUBLICATIONS, REFLECTI" |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD" |
ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION" |